Project Description
Site Cleaning
Supply all machinery, equipment, and materials to scrab 5 cm depth of the site’s natural ground soil and also remove all the existing trash, sand embankment,
Sub-base soil (Type – B)
Supplying all necessary items, materials, workmanship, and equipment to fill the roads with Sub-base soil (Type – B) with 1 layer 15 cm thick. In addition to filling the void at both sides of the road, the job also includes watering, and compacting to 95% of relative density by modified Proctor compaction test for each layer using a minimum 5-ton road roller for the open areas and manual compactor for narrow areas.
Concrete Keystone Floor pavement
Supply and Installation of Interlocking concrete Keystone floor pavement 8 cm thick units for walkways. The Color and pattern shall be according to the Engineer’s instructions. The work shall include the Backfilling with fine soil and sand with watering and compaction and the concrete mix shall be 1:3 for the shoulders of the site with all that is required to make the work complete.
| Contract No | TD-GZT-2023-0626 |
| Client | International Organization for Migration (IOM) |
| Project Address | Hatay Turkey |
| Start Date | 01-Dec-2023 |
| End Date | 01-Jan-2024 |