Project Description
The Contractor shall provide the following services:
Rehabilitation of Booster Pumps
Conduct an initial assessment of existing booster pumps to determine the extent of damage and required repairs.Replace any damaged or non- functional components to restore the pumps to full operational capacity.Test the rehabilitated pumps to ensure they meet operational efficiency standards.
Restoration of Water Wells
Inspect existing water wells to evaluate their structural integrity and functionality.Perform necessary repairs or enhancements to ensure a reliable water supply.Clean and disinfect water wells as needed to ensure water quality.Document the condition of each well before and after restoration.
Installation of Solar Energy Systems
Install 480 solar panels in accordance with the provided Technical Drawings and Specifications.Ensure that the solar panels are mounted securely and connected to the necessary electrical systems.Integrate the solar energy systems with the existing infrastructure of the medical facilities. Test the entire solar energy system to confirm its functionality and adherence to safety standards.
| Contract No | GHARANY FOUNDATION |
| Client | Gharany Foundation Organization Authorized Representative: Hakan Mehmet |
| Project Address | Northern Syria |
| Start Date | 2023 |
| End Date | 2023 |